MEISTER installation
Overseas installation work by MEISTER is planned from 50 units, subject to site, country and schedule review.
GREASE TRAP MEISTER GLOBALDiscuss an overseas installationEQUIPMENT + BIOFORMULATION + OPERATING CONDITIONS
Aeration, timed operation, circulation and the dedicated bioformulation are designed as one system. Copying the machine alone does not reproduce the combined process.
Overseas installation work by MEISTER is planned from 50 units, subject to site, country and schedule review.
Equipment can be supplied from one unit when installation is performed locally according to the provided requirements.
The biological formulation is supplied in large containers after consultation. The operating dilution is discussed for each site; a five-fold dilution is the initial reference, not a universal fixed condition.
02 / FOCUS
The standard unit is 100 V. The customer must provide a suitable transformer and confirm local voltage, frequency, plug, grounding and electrical safety requirements before installation.
01Country, city and number of units
02Facility type and meals per day
03Tank dimensions and compartment layout
04Photos, piping and installation space
05Local voltage and frequency
06Current cleaning, odor and waste conditions